Los Angeles has specific requirements for gate installations. Understanding when permits are needed helps avoid problems and delays.
When Permits Are Required
Typically Required
- Gates over 6 feet tall
- Electric/motorized gates
- Gates in public right-of-way
- Commercial properties
May Not Be Required
- Manual gates under 6 feet
- Replacement of existing gates
- Interior property gates
- Varies by jurisdiction
Permit Process
Steps
- Submit application with plans
- Pay permit fees
- Wait for approval
- Install per approved plans
- Request inspection
Timeline
- Simple permits: 1-2 weeks
- Complex projects: 4-8 weeks
- HOA approval: Additional time
Code Requirements
Common Requirements
- Minimum clearances
- Safety devices (UL 325)
- Emergency access provisions
- Sight line requirements
Fire Department Access
- Knox box or Supra key
- Strobe/siren activation
- Minimum opening width
HOA Considerations
- Architectural approval often needed
- Design guidelines
- Color restrictions
- Height limits
Permit Assistance
Standard Gate Co handles permitting for gate installations. Call (323) 488-GATE for a permit consultation.